Projects

2024

Besaikemu (2)
Besai Kemu (2 x 3,5 MW)

Installed by axerna

Lae Ordi (6)
Lae Ordi (2 x 5 MW)

Installed by axerna

Dominanga (1)
Dominanga (2 x 1,86 MW)

Installed by axerna

WhatsApp Image 2025-02-05 at 14.15.48 (2)
Wae Lega (2 x 1,23 MW)

Installed by axerna

2023

Aek Sibundong
Aek Sibundong (2 x 4,4 MW)

Installed by axerna

Tongar (2)
Tongar (2 x 3,2 MW)

Installed by axerna

2022

Pade (2)
Pade (9 MW)

Developed by axerna

Cilaki 1C (1)
Cilaki (10 MW)

Developed by axerna

Maiting Hulu (7)
Maiting Hulu 2 (2 x 4 MW)

Installed by axerna

filter: 0; fileterIntensity: 0.0; filterMask: 0; module: j; 
hw-remosaic: 0; 
touch: (-1.0, -1.0); 
modeInfo: ; 
sceneMode: Hdr; 
cct_value: 0; 
AI_Scene: (-1, -1); 
aec_lux: 241.2107; 
hist255: 0.0; 
hist252~255: 0.0; 
hist0~15: 0.0;
Padang Guci 2 (2 x 3,8 MW)

Installed by axerna

Madong (1)
Madong (2 x 5,6 MW)

Installed by axerna

2019-2021

Sako (6)
Sako (2 x 3,1 MW)

Installed by axerna

module: a; 
hw-remosaic: 0; 
touch: (0.45833334, 0.45833334); 
modeInfo: ; 
sceneMode: Night; 
cct_value: 0; 
AI_Scene: (-1, -1); 
aec_lux: 0.0; 
hist255: 0.0; 
hist252~255: 0.0; 
hist0~15: 0.0;
Cicatih (2 x 3,2 MW)

Installed by axerna

Lau Gunung
Lau Gunung (2 x 7,8 MW)

Installed by axerna

2017-2018

Jpeg
Sihope (14,4 MW)

Developed by axerna

Padang Guci (1)
Padang Guci 1 (2 x 2,3 MW)

Installed by axerna

2016

Sangir Hulu
Sangir Hulu (2 x 5 MW)

Installed by axerna

Pongbatik (7)
Pongbatik (3 MW)

Installed by axerna

Sinamar (3)
Sinamar (20,1 MW)

Developed by axerna

2014-2015

Sipogu (2)
Sipogu (6,8 MW)

Developed by axerna

Batang Gadis (1)
Batang Gadis (17,1 MW)

Developed by axerna

Gunung Tujuh
Gunung Tujuh (20 MW)

Developed by axerna

Sort

Batang Toru 1
Batang Toru 2
Harunda
Tara Bintang
Huto Padang
Kalaena
Sisirah
Batang Toru 3